Login | Register
產(chǎn)品中心
Home > Products > Screw pumps > Long lead screw pump
view  
 
A Long Lead Screw Pump is a high-performance positive displacement pump designed for the precise and efficient transfer of viscous, abrasive, and shear-sensitive fluids in demanding industrial applications. Featuring an extended lead screw and rotor-stator mechanism, this pump provides continuous, low-pulsation flow while handling large volumes with minimal energy consumption. Its long lead design ensures smooth and stable operation, making it ideal for industries such as chemical processing, food and beverage, pharmaceuticals, oil and gas, and wastewater treatment. The Long Lead Screw Pump excels at pumping high-viscosity liquids, pastes, and slurries, including oils, resins, adhesives, syrups, and sludge, without causing shear damage or compromising product quality. Constructed from durable, corrosion-resistant materials, it offers excellent wear resistance, long service life, and reliable performance even under harsh conditions. The pump’s robust yet compact design allows for easy installation, maintenance, and integration into automated production systems, reducing downtime and operational costs. With strong suction capabilities, high efficiency, and energy-saving performance, the Long Lead Screw Pump is suitable for continuous, precise, and hygienic fluid transfer, providing a versatile and dependable solution for modern industrial processes requiring consistent flow, accuracy, and durability.
  • Long lead screw pump

    Long lead screw pump

    The Long Lead Screw Pump is a specialized positive displacement pump designed for efficient transfer of highly viscous, abrasive, and particulate-laden fluids. Distinguished by its extended lead rotor, this pump delivers steady, non-pulsating flow over long distances and is ideal for applications requiring consistent metering, high pressure, or precise dosing.

    Send Inquiry

This website uses cookies to ensure you get the best experience on our website.

Accept Reject
滕州市| 象山县| 抚远县| 兴和县| 濉溪县| 额敏县| 建阳市| 新化县| 樟树市| 颍上县| 柘荣县| 丹棱县| 台东市| 东港市| 吴忠市| 兰州市| 班玛县| 盘锦市| 松阳县| 宁德市| 札达县| 买车| 喜德县| 锡林浩特市| 会宁县| 电白县| 武冈市| 新平| 壤塘县| 武城县| 兴海县| 舞钢市| 松原市| 尉氏县| 吐鲁番市| 宜宾市| 行唐县| 金华市| 大新县| 化州市| 兰西县|